Novarly ParcelRenewable sites

Renewable sitesCrystal Rig Wind Farm Phase 2a

Crystal Rig Wind Farm Phase 2a

Crystal Rig Wind Farm Phase 2a is an operational 138 MW onshore wind farm in Scotland, generating since 25 October 2010. Planning permission was granted on 30 July 2008, 12 months after submission. Operator of record: Fred Olsen Renewables.

138 MW
Capacity
as recorded in REPD
Operational
Status
since 25 October 2010
Wind Onshore
Technology
Fred Olsen Renewables
National
Authority
Scotland

Planning and build timeline

Application submitted17 July 2007
Permission granted30 July 2008
12 months after submission
Operational25 October 2010
27 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crystal Rig Wind Farm Phase 2a’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Under Construction
480.4 km
Battery · Operational
801.3 km
Wind Onshore · Operational
20.71.8 km
Wind Onshore · Operational
62.52.3 km
Wind Onshore · Operational
13.83 km
Wind Onshore · Operational
483.1 km
Wind Onshore · Operational
60.83.1 km
Wind Onshore · Operational
81.74.8 km

How big is Crystal Rig Wind Farm Phase 2a?

Crystal Rig Wind Farm Phase 2a has a recorded installed capacity of 138 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crystal Rig Wind Farm Phase 2a?

REPD records the operator as Fred Olsen Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crystal Rig Wind Farm Phase 2a approved and built?

The application was submitted on 17 July 2007. Permission was granted on 30 July 2008, 12 months later. The site became operational on 25 October 2010, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3440.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode