Renewable sitesFairham Business Park, Foresters Avenue - Roof Mounted Solar Panels

Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels

Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels is an operational 0.36 MW solar farm in Rushcliffe, generating since 7 September 2023. Planning permission was granted on 22 November 2023, 2 months after submission. Operator of record: Scientific Laboratory Supplies.

0.36 MW
Capacity
as recorded in REPD
Operational
Status
since 7 September 2023
Solar Photovoltaics
Technology
Scientific Laboratory Supplies
Rushcliffe
Authority
England

Planning and build timeline

Application submitted29 September 2023
Permission granted22 November 2023
2 months after submission
Operational7 September 2023

Screening a site of your own?

RedlineUK · £39

Rushcliffe approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rushcliffe’s record on solar

Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
1.72.4 km
Solar Photovoltaics · Operational
0.355.8 km
Battery · Operational
0.67.7 km
Solar Photovoltaics · Operational
0.187.7 km
EfW Incineration · Operational
97.7 km
Battery · Operational
0.58 km
Anaerobic Digestion · Operational
8.5 km
Solar Photovoltaics · Under Construction
0.628.7 km

How big is Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels?

Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels has a recorded installed capacity of 0.36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels?

REPD records the operator as Scientific Laboratory Supplies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels approved and built?

The application was submitted on 29 September 2023. Permission was granted on 22 November 2023, 2 months later. The site became operational on 7 September 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14982.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode