Renewable sitesPaytherden Solar Farm (Peradon)

Paytherden Solar Farm (Peradon)

Paytherden Solar Farm (Peradon) is under construction in East Devon with a recorded capacity of 49 MW.

49 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Lightrock Power Limited
East Devon
Authority
England

Planning and build timeline

Application submitted2021-12-14
Permission granted2022-12-07
12 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Devon’s record on solar

East Devon has decided 31 solar farms and approved 87%, taking a median of 4.5 months. See every solar farm decision in East Devon

Other built sites within 15 km

SiteMWDistance
Langford Solar Farm
Solar Photovoltaics · Operational
352.9 km
Langford Solar Farm
Battery · Operational
352.9 km
Winham Farm
Solar Photovoltaics · Operational
54.5 km
SAUNDERCROFT SOLAR FARM
Solar Photovoltaics · Operational
76 km
STRETE FARM SOLAR FARM
Solar Photovoltaics · Operational
4.86.7 km
Crannaford Solar Farm
Solar Photovoltaics · Operational
12.56.8 km
Kia Ora Farm
Solar Photovoltaics · Operational
1.87.2 km
Burrowton Farm
Solar Photovoltaics · Operational
57.5 km

How big is Paytherden Solar Farm (Peradon)?

Paytherden Solar Farm (Peradon) has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Paytherden Solar Farm (Peradon)?

REPD records the operator as Lightrock Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Paytherden Solar Farm (Peradon) approved and built?

The application was submitted on 2021-12-14. Permission was granted on 2022-12-07, 12 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11756.