EFDA JJET Fusion Flywheel
EFDA JJET Fusion Flywheel is operational in South Oxfordshire with a recorded capacity of 400 MW, and has been generating since 2006-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2006-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Sutton Courtney Landfill Gas · Operational | 6 | 3.3 km |
Sutton Courtenay Landfill Scheme Landfill Gas · Operational | 5.6 | 4 km |
Wally Corner Landfill Site Solar Photovoltaics · Operational | 7 | 4.6 km |
Cowley electricity sub-station Battery · Operational | 49.9 | 7.3 km |
BMW UK Manufacturing Ltd Solar Photovoltaics · Operational | 3 | 8.7 km |
Goose Willow Farm - extension Solar Photovoltaics · Operational | 7 | 8.8 km |
Langley Hall Farm Solar Photovoltaics · Operational | 2.4 | 9.1 km |
Goose Willow Farm Solar Photovoltaics · Operational | 11.5 | 9.2 km |
How big is EFDA JJET Fusion Flywheel?
EFDA JJET Fusion Flywheel has a recorded installed capacity of 400 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates EFDA JJET Fusion Flywheel?
REPD records the operator as EFDA JET. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was EFDA JJET Fusion Flywheel approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2006-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6865.