Novarly ParcelRenewable sites

Renewable sitesEFDA JJET Fusion Flywheel

EFDA JJET Fusion Flywheel

EFDA JJET Fusion Flywheel is operational in South Oxfordshire with a recorded capacity of 400 MW, and has been generating since 2006-01-01.

400 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-01-01
Flywheels
Technology
EFDA JET
South Oxfordshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2006-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Sutton Courtney
Landfill Gas · Operational
63.3 km
Sutton Courtenay Landfill Scheme
Landfill Gas · Operational
5.64 km
Wally Corner Landfill Site
Solar Photovoltaics · Operational
74.6 km
Cowley electricity sub-station
Battery · Operational
49.97.3 km
BMW UK Manufacturing Ltd
Solar Photovoltaics · Operational
38.7 km
Goose Willow Farm - extension
Solar Photovoltaics · Operational
78.8 km
Langley Hall Farm
Solar Photovoltaics · Operational
2.49.1 km
Goose Willow Farm
Solar Photovoltaics · Operational
11.59.2 km

How big is EFDA JJET Fusion Flywheel?

EFDA JJET Fusion Flywheel has a recorded installed capacity of 400 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates EFDA JJET Fusion Flywheel?

REPD records the operator as EFDA JET. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was EFDA JJET Fusion Flywheel approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2006-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6865.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council