Novarly ParcelRenewable sites

Renewable sitesLonglands Farm, Rush Wall Lane

Longlands Farm, Rush Wall Lane

Longlands Farm, Rush Wall Lane is an operational 3.5 MW onshore wind farm in Newport, generating since 1 January 2021. REPD does not record the planning grant date. Operator of record: Clean Earth (CE).

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2021
Wind Onshore
Technology
Clean Earth (CE)
Newport
Authority
Wales

Planning and build timeline

Application submitted3 May 2018
Permission grantednot recorded
Operational1 January 2021

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Newport: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Longlands Farm, Rush Wall Lane’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
753.9 km
Solar Photovoltaics · Operational
8.54 km
Solar Photovoltaics · Operational
2.55.5 km
Battery · Operational
6.2 km
Biomass (co-firing) · Operational
187.4 km
Battery · Under Construction
2307.4 km
Solar Photovoltaics · Operational
7.6 km
Wind Onshore · Operational
57.9 km

How big is Longlands Farm, Rush Wall Lane?

Longlands Farm, Rush Wall Lane has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Longlands Farm, Rush Wall Lane?

REPD records the operator as Clean Earth (CE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Longlands Farm, Rush Wall Lane approved and built?

The application was submitted on 3 May 2018. REPD does not record a grant date. The site became operational on 1 January 2021.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6509.

Novarly Parcel · official public data, read properly · parcel.novarly.com