Common Barn Wind Farm
Common Barn Wind Farm is operational in Huntingdonshire with a recorded capacity of 6.2 MW, and has been generating since 2019-05-09.
Planning and build timeline
| Application submitted | 2012-05-15 |
| Permission granted | 2013-07-11 14 months after submission |
| Operational | 2019-05-09 70 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Huntingdonshire’s record on onshore wind
Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Littleyhey Prison Solar Farm Solar Photovoltaics · Operational | 0.5 | 1.9 km |
Station Farm Landfill Scheme Landfill Gas · Operational | 2 | 5.4 km |
Staughton Airfield Solar Farm Solar Photovoltaics · Operational | 40 | 6.3 km |
Cotton Farm Wind Onshore · Operational | 20 | 6.6 km |
Woolley Hill Wind Farm Wind Onshore · Operational | 10 | 7.1 km |
ROOKERY FARM SOLAR FARM Solar Photovoltaics · Operational | 5.3 | 8 km |
Caldecote Manor Farm Solar Photovoltaics · Operational | 5 | 9.3 km |
Manor Farm - Pertenhall Solar Photovoltaics · Operational | 15 | 9.3 km |
How big is Common Barn Wind Farm?
Common Barn Wind Farm has a recorded installed capacity of 6.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Common Barn Wind Farm?
REPD records the operator as TCI Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Common Barn Wind Farm approved and built?
The application was submitted on 2012-05-15. Permission was granted on 2013-07-11, 14 months later. The site became operational on 2019-05-09, 70 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4076.