Common Barn Wind Farm is an operational 6.2 MW onshore wind farm in Huntingdonshire, generating since 9 May 2019. Planning permission was granted on 11 July 2013, 14 months after submission. Operator of record: TCI Renewables.

6.2 MW
Capacity
as recorded in REPD
Operational
Status
since 9 May 2019
Wind Onshore
Technology
TCI Renewables
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted15 May 2012
Permission granted11 July 2013
14 months after submission
Operational9 May 2019
70 months after consent

Screening a site of your own?

RedlineUK · £39

Huntingdonshire approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Common Barn Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Huntingdonshire’s record on onshore wind

Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.51.9 km
Landfill Gas · Operational
25.4 km
Solar Photovoltaics · Operational
406.3 km
Wind Onshore · Operational
206.6 km
Wind Onshore · Operational
107.1 km
Solar Photovoltaics · Operational
5.38 km
Solar Photovoltaics · Operational
59.3 km
Solar Photovoltaics · Operational
159.3 km

How big is Common Barn Wind Farm?

Common Barn Wind Farm has a recorded installed capacity of 6.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Common Barn Wind Farm?

REPD records the operator as TCI Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Common Barn Wind Farm approved and built?

The application was submitted on 15 May 2012. Permission was granted on 11 July 2013, 14 months later. The site became operational on 9 May 2019, 70 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4076.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode