Novarly ParcelRenewable sites

Renewable sitesMeadow Lane Park and Ride

Meadow Lane Park and Ride

Meadow Lane Park and Ride is a battery storage site under construction in Huntingdonshire. REPD does not record the planning grant date. Operator of record: Cambridgeshire CC / Bouygues Energies.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Cambridgeshire CC / Bouygues Energies
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted7 April 2017
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Huntingdonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Meadow Lane Park and Ride’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.90 km
Solar Photovoltaics · Operational
6.83.8 km
Solar Photovoltaics · Operational
4.13.9 km
Landfill Gas · Operational
36.3 km
Solar Photovoltaics · Operational
2.47 km
Solar Photovoltaics · Operational
3.910.4 km
Solar Photovoltaics · Operational
24.711 km
Landfill Gas · Operational
211.1 km

How big is Meadow Lane Park and Ride?

REPD does not record an installed capacity for Meadow Lane Park and Ride.

Who operates Meadow Lane Park and Ride?

REPD records the operator as Cambridgeshire CC / Bouygues Energies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Meadow Lane Park and Ride approved and built?

The application was submitted on 7 April 2017. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7055.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode