Woolley Hill Wind Farm

Woolley Hill Wind Farm is operational in Huntingdonshire with a recorded capacity of 10 MW, and has been generating since 2014-04-30.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-04-30
Wind Onshore
Technology
Aviva
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted2010-11-11
Permission granted2012-03-23
16 months after submission
Operational2014-04-30
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Huntingdonshire’s record on onshore wind

Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire

Other built sites within 15 km

SiteMWDistance
ROOKERY FARM SOLAR FARM
Solar Photovoltaics · Operational
5.35.7 km
Station Farm Landfill Scheme
Landfill Gas · Operational
26.6 km
Littleyhey Prison Solar Farm
Solar Photovoltaics · Operational
0.56.6 km
Common Barn Wind Farm
Wind Onshore · Operational
6.27.1 km
Abbots Ripton Solar Farm (ext.)
Solar Photovoltaics · Operational
3.98.6 km
Abbots Ripton Solar Farm
Solar Photovoltaics · Operational
24.78.6 km
Abbey Farm
Solar Photovoltaics · Operational
910.1 km
Godmanchester
Landfill Gas · Operational
310.5 km

How big is Woolley Hill Wind Farm?

Woolley Hill Wind Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woolley Hill Wind Farm?

REPD records the operator as Aviva. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woolley Hill Wind Farm approved and built?

The application was submitted on 2010-11-11. Permission was granted on 2012-03-23, 16 months later. The site became operational on 2014-04-30, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4175.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council