Novarly ParcelRenewable sites

Renewable sitesWoolley Hill Wind Farm

Woolley Hill Wind Farm

Woolley Hill Wind Farm is an operational 10 MW onshore wind farm in Huntingdonshire, generating since 30 April 2014. Planning permission was granted on 23 March 2012, 16 months after submission. Operator of record: Aviva.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 30 April 2014
Wind Onshore
Technology
Aviva
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted11 November 2010
Permission granted23 March 2012
16 months after submission
Operational30 April 2014
25 months after consent

Screening a site of your own?

RedlineUK · £39

Huntingdonshire approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Woolley Hill Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Huntingdonshire’s record on onshore wind

Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
5.35.7 km
Landfill Gas · Operational
26.6 km
Solar Photovoltaics · Operational
0.56.6 km
Wind Onshore · Operational
6.27.1 km
Solar Photovoltaics · Operational
3.98.6 km
Solar Photovoltaics · Operational
24.78.6 km
Solar Photovoltaics · Operational
910.1 km
Landfill Gas · Operational
310.5 km

How big is Woolley Hill Wind Farm?

Woolley Hill Wind Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woolley Hill Wind Farm?

REPD records the operator as Aviva. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woolley Hill Wind Farm approved and built?

The application was submitted on 11 November 2010. Permission was granted on 23 March 2012, 16 months later. The site became operational on 30 April 2014, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4175.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode