Novarly ParcelRenewable sites

Renewable sitesHardingham Solar Farm - extension

Hardingham Solar Farm - extension

Hardingham Solar Farm - extension is operational in Breckland with a recorded capacity of 5.2 MW, and has been generating since 2015-02-19.

5.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-02-19
Solar Photovoltaics
Technology
Solar Century/ Bluefield Solar
Breckland
Authority
England

Planning and build timeline

Application submitted2014-05-23
Permission granted2014-10-28
5 months after submission
Operational2015-02-19
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Breckland’s record on solar

Breckland has decided 27 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Breckland

Other built sites within 15 km

SiteMWDistance
Hardingham Solar Farm
Solar Photovoltaics · Operational
14.80.3 km
Colton - Solar photovoltaic farm, Battery storage
Solar Photovoltaics · Under Construction
306.3 km
Colton - Solar photovoltaic farm, Battery storage
Battery · Under Construction
306.3 km
Rookery Business Park
Solar Photovoltaics · Operational
57.9 km
Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion
Anaerobic Digestion · Operational
19.5 km
Weston Airfield Wind Turbines
Wind Onshore · Operational
3.611 km
The Old Airfield
Solar Photovoltaics · Operational
511.1 km
The Everest System
Battery · Operational
0.111.1 km

How big is Hardingham Solar Farm - extension?

Hardingham Solar Farm - extension has a recorded installed capacity of 5.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hardingham Solar Farm - extension?

REPD records the operator as Solar Century/ Bluefield Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hardingham Solar Farm - extension approved and built?

The application was submitted on 2014-05-23. Permission was granted on 2014-10-28, 5 months later. The site became operational on 2015-02-19, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2300.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council