Renewable sites › Reliance Street Mechanical Biological Treatment Facility (MBT)
Reliance Street Mechanical Biological Treatment Facility (MBT)
Reliance Street Mechanical Biological Treatment Facility (MBT) is operational in Manchester with a recorded capacity of 2 MW, and has been generating since 2011-04-07.
Planning and build timeline
| Application submitted | 2007-08-30 |
| Permission granted | 2008-10-09 13 months after submission |
| Operational | 2011-04-07 30 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Central Park - Solar photovaltics Solar Photovoltaics · Operational | 0.15 | 1.5 km |
Moston Vale Battery · Under Construction | 10 | 1.8 km |
Land at Wrigley Head Solar Photovoltaics · Under Construction | 0.9 | 2.2 km |
The National Cycling Centre - Solar Photovoltaic Panels Solar Photovoltaics · Under Construction | 0.92 | 2.2 km |
The National Cycling Centre Velodrome Solar Photovoltaics · Operational | 0.7 | 2.2 km |
City Football Academy, Ashton New Road - Solar panels Solar Photovoltaics · Under Construction | 3.38 | 2.7 km |
Chadderton - Battery energy storage facility Battery · Under Construction | 20 | 3.2 km |
Whitegate Battery Storage Battery · Under Construction | 57 | 3.3 km |
How big is Reliance Street Mechanical Biological Treatment Facility (MBT)?
Reliance Street Mechanical Biological Treatment Facility (MBT) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Reliance Street Mechanical Biological Treatment Facility (MBT)?
REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Reliance Street Mechanical Biological Treatment Facility (MBT) approved and built?
The application was submitted on 2007-08-30. Permission was granted on 2008-10-09, 13 months later. The site became operational on 2011-04-07, 30 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 218.