Planning and build timeline
| Application submitted | 2014-07-15 |
| Permission granted | 2014-10-14 3 months after submission |
| Operational | 2015-12-15 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — South Devon
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Hams’s record on solar
South Hams has decided 27 solar farms and approved 93%, taking a median of 3.3 months. See every solar farm decision in South Hams →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Newton Downs Farm Solar Photovoltaics · Operational | 5 | 2.6 km |
Creacombe Solar Farm Solar Photovoltaics · Operational | 7.3 | 4.7 km |
Langage Solar Farm Solar Photovoltaics · Operational | 5 | 4.8 km |
Chelson Meadow 2 Landfill Gas · Operational | 1.4 | 6.1 km |
Chelson Meadow Gas to Energy Scheme Landfill Gas · Operational | 1.8 | 6.1 km |
Newnham Estate Solar Photovoltaics · Operational | 14 | 6.6 km |
Luson Farm Solar Photovoltaics · Operational | 1.9 | 6.9 km |
Princess Yachts Limited - Solar PV system Solar Photovoltaics · Under Construction | 0.7 | 9.2 km |
How big is Balls Wood Solar Farm?
Balls Wood Solar Farm has a recorded installed capacity of 8.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Balls Wood Solar Farm?
REPD records the operator as Due South Energy & SunE Project6 Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Balls Wood Solar Farm approved and built?
The application was submitted on 2014-07-15. Permission was granted on 2014-10-14, 3 months later. The site became operational on 2015-12-15, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1958.