Ceannacroc
Ceannacroc is an operational 20 MW hydro scheme in Highland, generating since 1 January 1956. REPD does not record the planning grant date. Operator of record: Scottish and Southern Energy (SSE).
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 January 1956 |
Screening a site of your own?
Redline runs the record on your own boundary in Highland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ceannacroc’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Small Hydro · Operational | 1.6 | 0.6 km |
Wind Onshore · Operational | 10 | 2.5 km |
Wind Onshore · Operational | 40 | 2.9 km |
Wind Onshore · Operational | 15 | 2.9 km |
Wind Onshore · Operational | 23.8 | 6.7 km |
Wind Onshore · Operational | 85 | 6.7 km |
Small Hydro · Operational | 1.3 | 10.3 km |
Battery · Operational | 49.9 | 12.4 km |
How big is Ceannacroc?
Ceannacroc has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ceannacroc?
REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ceannacroc approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 1956.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 402.