Novarly ParcelRenewable sites

Renewable sitesCarlton Farm Solar farm

Carlton Farm Solar farm

Carlton Farm Solar farm is operational in North Norfolk with a recorded capacity of 5 MW, and has been generating since 2011-10-31.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-10-31
Solar Photovoltaics
Technology
Private Developer
North Norfolk
Authority
England

Planning and build timeline

Application submitted2011-04-07
Permission granted2011-05-24
2 months after submission
Operational2011-10-31
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Norfolk’s record on solar

North Norfolk has decided 26 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in North Norfolk

Other built sites within 15 km

SiteMWDistance
Bunn's Hill Solar Park
Solar Photovoltaics · Operational
50.7 km
Frog's Loke Solar Farm
Solar Photovoltaics · Operational
50.7 km
Oak Grove Biomass Facility
Anaerobic Digestion · Operational
24.9 km
H M Prison Bure
Solar Photovoltaics · Operational
0.26.2 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 1)
Solar Photovoltaics · Operational
326.2 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 2)
Solar Photovoltaics · Operational
17.96.2 km
Mayton Wood Landfill Site
Landfill Gas · Operational
1.58.9 km
North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme
Battery · Operational
612.3 km

How big is Carlton Farm Solar farm?

Carlton Farm Solar farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Carlton Farm Solar farm?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Carlton Farm Solar farm approved and built?

The application was submitted on 2011-04-07. Permission was granted on 2011-05-24, 2 months later. The site became operational on 2011-10-31, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1029.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council