Renewable sitesScottow Moor - RAF Coltishall Solar Farm (Phase 2)

Scottow Moor - RAF Coltishall Solar Farm (Phase 2)

Scottow Moor - RAF Coltishall Solar Farm (Phase 2) is an operational 17.9 MW solar farm in North Norfolk, generating since 29 March 2016. Planning permission was granted on 23 December 2014, 2 months after submission. Operator of record: Greencoat Capital.

17.9 MW
Capacity
as recorded in REPD
Operational
Status
since 29 March 2016
Solar Photovoltaics
Technology
Greencoat Capital
North Norfolk
Authority
England

Planning and build timeline

Application submitted9 October 2014
Permission granted23 December 2014
2 months after submission
Operational29 March 2016
15 months after consent

Screening a site of your own?

RedlineUK · £39

North Norfolk approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Scottow Moor - RAF Coltishall Solar Farm (Phase 2)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Norfolk’s record on solar

North Norfolk has decided 26 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in North Norfolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
320 km
Solar Photovoltaics · Operational
0.20.8 km
Anaerobic Digestion · Operational
21.5 km
Landfill Gas · Operational
1.52.8 km
Solar Photovoltaics · Operational
55.6 km
Solar Photovoltaics · Operational
55.6 km
Solar Photovoltaics · Operational
56.2 km
Solar Photovoltaics · Operational
57.9 km

How big is Scottow Moor - RAF Coltishall Solar Farm (Phase 2)?

Scottow Moor - RAF Coltishall Solar Farm (Phase 2) has a recorded installed capacity of 17.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Scottow Moor - RAF Coltishall Solar Farm (Phase 2)?

REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Scottow Moor - RAF Coltishall Solar Farm (Phase 2) approved and built?

The application was submitted on 9 October 2014. Permission was granted on 23 December 2014, 2 months later. The site became operational on 29 March 2016, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5199.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode