Novarly ParcelRenewable sites

Renewable sitesMayton Wood Landfill Site

Mayton Wood Landfill Site

Mayton Wood Landfill Site is operational in Broadland with a recorded capacity of 1.5 MW, and has been generating since 1996-03-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-03-01
Landfill Gas
Technology
Combined Landfill Projects (CLP)
Broadland
Authority
England

Planning and build timeline

Application submitted1993-12-10
Permission granted1994-04-14
4 months after submission
Operational1996-03-01
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
H M Prison Bure
Solar Photovoltaics · Operational
0.22.7 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 1)
Solar Photovoltaics · Operational
322.8 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 2)
Solar Photovoltaics · Operational
17.92.8 km
Oak Grove Biomass Facility
Anaerobic Digestion · Operational
24 km
Salhouse Solar Farm
Solar Photovoltaics · Operational
57.5 km
Bunn's Hill Solar Park
Solar Photovoltaics · Operational
58.3 km
Frog's Loke Solar Farm
Solar Photovoltaics · Operational
58.3 km
Carlton Farm Solar farm
Solar Photovoltaics · Operational
58.9 km

How big is Mayton Wood Landfill Site?

Mayton Wood Landfill Site has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mayton Wood Landfill Site?

REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mayton Wood Landfill Site approved and built?

The application was submitted on 1993-12-10. Permission was granted on 1994-04-14, 4 months later. The site became operational on 1996-03-01, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 728.