North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme
North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme is an operational 6 MW battery storage site in North Norfolk. Planning permission was granted on 19 December 2022, 13 months after submission. Operator of record: Next Energy.
Planning and build timeline
| Application submitted | 23 November 2021 |
| Permission granted | 19 December 2022 13 months after submission |
| Operational | not recorded |
Screening a site of your own?
North Norfolk approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — Norfolk Coast
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Norfolk’s record on battery storage
North Norfolk has decided 5 battery storage schemes and approved 100%, taking a median of 4.5 months. See every battery storage scheme decision in North Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 11 | 0.1 km |
Solar Photovoltaics · Operational | 10.2 | 8.3 km |
Solar Photovoltaics · Operational | 3.6 | 9.4 km |
Solar Photovoltaics · Operational | 5 | 12.3 km |
Solar Photovoltaics · Operational | 5 | 12.9 km |
Solar Photovoltaics · Operational | 5 | 12.9 km |
Solar Photovoltaics · Operational | 5 | 14.3 km |
How big is North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme?
North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme?
REPD records the operator as Next Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme approved and built?
The application was submitted on 23 November 2021. Permission was granted on 19 December 2022, 13 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10497.