Renewable sites › H M Prison Bure
H M Prison Bure
H M Prison Bure is an operational 0.2 MW solar farm in North Norfolk, generating since 1 March 2021. Planning permission was granted on 25 June 2020, 2 months after submission. Operator of record: Arcadis / Ministry of Justice.
Planning and build timeline
| Application submitted | 30 April 2020 |
| Permission granted | 25 June 2020 2 months after submission |
| Operational | 1 March 2021 8 months after consent |
Screening a site of your own?
North Norfolk approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with H M Prison Bure’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Conservation area — RAF Coltishall (Badersfield, Scottow)
- Nutrient-neutrality catchment — Bure Broads and Marshes
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Norfolk’s record on solar
North Norfolk has decided 26 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in North Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 17.9 | 0.8 km |
Solar Photovoltaics · Operational | 32 | 0.8 km |
Anaerobic Digestion · Operational | 2 | 1.2 km |
Landfill Gas · Operational | 1.5 | 2.7 km |
Solar Photovoltaics · Operational | 5 | 5.6 km |
Solar Photovoltaics · Operational | 5 | 5.6 km |
Solar Photovoltaics · Operational | 5 | 6.2 km |
Solar Photovoltaics · Operational | 5 | 8.6 km |
How big is H M Prison Bure?
H M Prison Bure has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates H M Prison Bure?
REPD records the operator as Arcadis / Ministry of Justice. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was H M Prison Bure approved and built?
The application was submitted on 30 April 2020. Permission was granted on 25 June 2020, 2 months later. The site became operational on 1 March 2021, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7928.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode