Renewable sites › Energy Works Hull - Wind Turbine
Energy Works Hull - Wind Turbine
Energy Works Hull - Wind Turbine is operational in Kingston upon Hull, City of with a recorded capacity of 3 MW, and has been generating since 2018-03-01.
Planning and build timeline
| Application submitted | 2011-06-27 |
| Permission granted | 2011-10-20 4 months after submission |
| Operational | 2018-03-01 76 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Energy Works (Hull) Advanced Conversion Technologies · Operational | 25 | 0 km |
Energy Works Hull - AD (Waste AD) Anaerobic Digestion · Operational | 3 | 0 km |
Samaritans Spring Bank Solar Panels Solar Photovoltaics · Operational | — | 1.7 km |
King George Dock Biomass (dedicated) · Operational | 9 | 3.6 km |
Carlam Hill Education CIC Solar Photovoltaics · Operational | 5 | 5.6 km |
Hull Solar Farm Solar Photovoltaics · Under Construction | 25.7 | 6.2 km |
The Limes Wind Turbines Wind Onshore · Operational | 1.7 | 6.3 km |
Saltend Wind Turbine Wind Onshore · Operational | 1.3 | 6.4 km |
How big is Energy Works Hull - Wind Turbine?
Energy Works Hull - Wind Turbine has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Energy Works Hull - Wind Turbine?
REPD records the operator as Spencer Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Energy Works Hull - Wind Turbine approved and built?
The application was submitted on 2011-06-27. Permission was granted on 2011-10-20, 4 months later. The site became operational on 2018-03-01, 76 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3893.