Calow Green Farm is operational in North East Derbyshire with a recorded capacity of 20 MW, and has been generating since 2019-10-01.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-10-01
Battery
Technology
Arlington Energy (formerly Enso Energy)
North East Derbyshire
Authority
England

Planning and build timeline

Application submitted2018-09-10
Permission granted2020-03-31
19 months after submission
Operational2019-10-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North East Derbyshire’s record on battery storage

North East Derbyshire has decided 10 battery storage schemes and approved 60%, taking a median of 3.3 months. See every battery storage scheme decision in North East Derbyshire

Other built sites within 15 km

SiteMWDistance
Land To The East Of Back Lane
Solar Photovoltaics · Operational
50.6 km
Land north of Temple Normanton
Solar Photovoltaics · Operational
4.91.6 km
Cherry Tree Farm
Solar Photovoltaics · Operational
52.7 km
Arkwright Solar Farm
Solar Photovoltaics · Operational
83.5 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Battery · Operational
4.8 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Solar Photovoltaics · Operational
314.8 km
Glapwell
Landfill Gas · Operational
1.24.9 km
Glapwell Power
Landfill Gas · Operational
25.1 km

How big is Calow Green Farm?

Calow Green Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Calow Green Farm?

REPD records the operator as Arlington Energy (formerly Enso Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Calow Green Farm approved and built?

The application was submitted on 2018-09-10. Permission was granted on 2020-03-31, 19 months later. The site became operational on 2019-10-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7140.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council