Glapwell

Glapwell is operational in Bolsover with a recorded capacity of 1.2 MW, and has been generating since 2001-04-30.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-04-30
Landfill Gas
Technology
Yorkshire Environmental Solutions / Waste Recycling Group
Bolsover
Authority
England

Planning and build timeline

Application submitted1999-10-11
Permission granted2000-04-11
6 months after submission
Operational2001-04-30
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Glapwell Power
Landfill Gas · Operational
20.4 km
Land north of Temple Normanton
Solar Photovoltaics · Operational
4.94.3 km
Cherry Tree Farm
Solar Photovoltaics · Operational
54.7 km
Calow Green Farm
Battery · Operational
204.9 km
Land To The East Of Back Lane
Solar Photovoltaics · Operational
55.2 km
Land at Bolsover Moor Quarry
Solar Photovoltaics · Operational
55.8 km
Arkwright Solar Farm
Solar Photovoltaics · Operational
85.9 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
36.6 km

How big is Glapwell?

Glapwell has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glapwell?

REPD records the operator as Yorkshire Environmental Solutions / Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glapwell approved and built?

The application was submitted on 1999-10-11. Permission was granted on 2000-04-11, 6 months later. The site became operational on 2001-04-30, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 529.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council