Braevallich

Braevallich is an operational 2.2 MW hydro scheme in Argyll and Bute, generating since 1 January 2005. Planning permission was granted on 26 March 2003, 8 months after submission. Operator of record: Innogy.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2005
Small Hydro
Technology
Innogy
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted7 August 2002
Permission granted26 March 2003
8 months after submission
Operational1 January 2005
21 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Braevallich’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
19.33.9 km
Small Hydro · Operational
1.95.3 km
Wind Onshore · Operational
48.36.8 km
Small Hydro · Operational
17.2 km
Small Hydro · Operational
37.9 km
Small Hydro · Operational
113.5 km
Wind Onshore · Operational
4614.3 km
Small Hydro · Operational
214.7 km

How big is Braevallich?

Braevallich has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Braevallich?

REPD records the operator as Innogy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Braevallich approved and built?

The application was submitted on 7 August 2002. Permission was granted on 26 March 2003, 8 months later. The site became operational on 1 January 2005, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 503.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode