Douglas Water Hydro

Douglas Water Hydro is an operational 3 MW hydro scheme in Argyll and Bute, generating since 1 May 2008. Planning permission was granted on 17 November 2005, 28 months after submission. Operator of record: RWE npower.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2008
Small Hydro
Technology
RWE npower
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted17 July 2003
Permission granted17 November 2005
28 months after submission
Operational1 May 2008
29 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Douglas Water Hydro’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
19.34.1 km
Small Hydro · Operational
15.2 km
Small Hydro · Operational
15.9 km
Small Hydro · Operational
2.27.9 km
Wind Onshore · Operational
48.311.9 km
Small Hydro · Operational
1.912.3 km

How big is Douglas Water Hydro?

Douglas Water Hydro has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Douglas Water Hydro?

REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Douglas Water Hydro approved and built?

The application was submitted on 17 July 2003. Permission was granted on 17 November 2005, 28 months later. The site became operational on 1 May 2008, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 425.