Renewable sites › Ederline Hydro
Ederline Hydro
Ederline Hydro is an operational 1.9 MW hydro scheme in Argyll and Bute, generating since 31 January 2014. Planning permission was granted on 2 June 2009, 1 months after submission. Operator of record: Gilkes Energy.
Planning and build timeline
| Application submitted | 20 April 2009 |
| Permission granted | 2 June 2009 1 months after submission |
| Operational | 31 January 2014 56 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ederline Hydro’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 48.3 | 3.3 km |
Small Hydro · Operational | 2.2 | 5.3 km |
Wind Onshore · Operational | 19.3 | 8.8 km |
Small Hydro · Operational | 1 | 9.5 km |
Large Hydro · Operational | 6 | 12.1 km |
Small Hydro · Operational | 3 | 12.3 km |
Small Hydro · Operational | 2 | 14.1 km |
How big is Ederline Hydro?
Ederline Hydro has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ederline Hydro?
REPD records the operator as Gilkes Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ederline Hydro approved and built?
The application was submitted on 20 April 2009. Permission was granted on 2 June 2009, 1 months later. The site became operational on 31 January 2014, 56 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 445.
Novarly Parcel · official public data, read properly · parcel.novarly.com