Renewable sites › An Suidhe
An Suidhe
An Suidhe is operational in Argyll and Bute with a recorded capacity of 19.3 MW, and has been generating since 2010-08-04.
Planning and build timeline
| Application submitted | 2005-08-22 |
| Permission granted | 2005-10-21 2 months after submission |
| Operational | 2010-08-04 57 months after consent |
Argyll and Bute’s record on onshore wind
Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Braevallich Small Hydro · Operational | 2.2 | 3.9 km |
Douglas Water Hydro Small Hydro · Operational | 3 | 4.1 km |
Leacann Hydro Small Hydro · Operational | 1 | 5.5 km |
Ederline Hydro Small Hydro · Operational | 1.9 | 8.8 km |
A'Chruach (Phase 1) Wind Onshore · Operational | 48.3 | 9.3 km |
Glen Fyne 'Merk' Hydro Small Hydro · Operational | 1 | 9.6 km |
Carraig Gheal Wind Onshore · Operational | 46 | 14.2 km |
How big is An Suidhe?
An Suidhe has a recorded installed capacity of 19.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates An Suidhe?
REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was An Suidhe approved and built?
The application was submitted on 2005-08-22. Permission was granted on 2005-10-21, 2 months later. The site became operational on 2010-08-04, 57 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3298.
Novarly Parcel · official public data, read properly · parcel.novarly.com