Novarly ParcelRenewable sites

Renewable sitesAn Suidhe

An Suidhe

An Suidhe is an operational 19.3 MW onshore wind farm in Argyll and Bute, generating since 4 August 2010. Planning permission was granted on 21 October 2005, 2 months after submission. Operator of record: RWE npower.

19.3 MW
Capacity
as recorded in REPD
Operational
Status
since 4 August 2010
Wind Onshore
Technology
RWE npower
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted22 August 2005
Permission granted21 October 2005
2 months after submission
Operational4 August 2010
57 months after consent

Screening a site of your own?

RedlineUK · £39

Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with An Suidhe’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
2.23.9 km
Small Hydro · Operational
34.1 km
Small Hydro · Operational
15.5 km
Small Hydro · Operational
1.98.8 km
Wind Onshore · Operational
48.39.3 km
Small Hydro · Operational
19.6 km
Wind Onshore · Operational
4614.2 km

How big is An Suidhe?

An Suidhe has a recorded installed capacity of 19.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates An Suidhe?

REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was An Suidhe approved and built?

The application was submitted on 22 August 2005. Permission was granted on 21 October 2005, 2 months later. The site became operational on 4 August 2010, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3298.

Novarly Parcel · official public data, read properly · parcel.novarly.com