An Suidhe is operational in Argyll and Bute with a recorded capacity of 19.3 MW, and has been generating since 2010-08-04.

19.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-08-04
Wind Onshore
Technology
RWE npower
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted2005-08-22
Permission granted2005-10-21
2 months after submission
Operational2010-08-04
57 months after consent

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Braevallich
Small Hydro · Operational
2.23.9 km
Douglas Water Hydro
Small Hydro · Operational
34.1 km
Leacann Hydro
Small Hydro · Operational
15.5 km
Ederline Hydro
Small Hydro · Operational
1.98.8 km
A'Chruach (Phase 1)
Wind Onshore · Operational
48.39.3 km
Glen Fyne 'Merk' Hydro
Small Hydro · Operational
19.6 km
Carraig Gheal
Wind Onshore · Operational
4614.2 km

How big is An Suidhe?

An Suidhe has a recorded installed capacity of 19.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates An Suidhe?

REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was An Suidhe approved and built?

The application was submitted on 2005-08-22. Permission was granted on 2005-10-21, 2 months later. The site became operational on 2010-08-04, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3298.