Novarly ParcelRenewable sites

Renewable sitesSalford Refuse Treatment Plant (AD)

Salford Refuse Treatment Plant (AD)

Salford Refuse Treatment Plant (AD) is operational in Salford with a recorded capacity of 2 MW, and has been generating since 2013-11-30.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-11-30
Anaerobic Digestion
Technology
Viridor
Salford
Authority
England

Planning and build timeline

Application submitted2007-08-15
Permission granted2008-03-06
7 months after submission
Operational2013-11-30
69 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Turnpike Depot - Solar Panels
Solar Photovoltaics · Under Construction
0.482.3 km
Clifton Hall
Landfill Gas · Operational
13.4 km
Royal Northern College Of Music, Oxford Road - Solar Photovoltaic panels
Solar Photovoltaics · Under Construction
0.174.5 km
Moston Vale
Battery · Under Construction
105.4 km
Central Park - Solar photovaltics
Solar Photovoltaics · Operational
0.155.7 km
Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant)
EfW Incineration · Operational
33.55.8 km
City Football Academy, Ashton New Road - Solar panels
Solar Photovoltaics · Under Construction
3.386.4 km
The National Cycling Centre Velodrome
Solar Photovoltaics · Operational
0.76.4 km

How big is Salford Refuse Treatment Plant (AD)?

Salford Refuse Treatment Plant (AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salford Refuse Treatment Plant (AD)?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salford Refuse Treatment Plant (AD) approved and built?

The application was submitted on 2007-08-15. Permission was granted on 2008-03-06, 7 months later. The site became operational on 2013-11-30, 69 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 912.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council