Renewable sites › Beinn an Tuirc Windfarm Phase 3
Beinn an Tuirc Windfarm Phase 3
Beinn an Tuirc Windfarm Phase 3 is a 49.9 MW onshore wind farm under construction in Argyll and Bute. Planning permission was granted on 23 February 2017, 16 months after submission. Operator of record: Scottish Power Renewables.
Planning and build timeline
| Application submitted | 3 November 2015 |
| Permission granted | 23 February 2017 16 months after submission |
| Operational | not recorded |
Screening a site of your own?
Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Beinn an Tuirc Windfarm Phase 3’s recorded coordinate — swap in your own postcode or coordinates.
Argyll and Bute’s record on onshore wind
Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 6.9 | 3.1 km |
Wind Onshore · Operational | 35 | 3.2 km |
Wind Onshore · Operational | 43.7 | 3.4 km |
Wind Onshore · Operational | 29.7 | 3.4 km |
Wind Onshore · Operational | 15 | 4.7 km |
Wind Onshore · Operational | 12.8 | 6.6 km |
Wind Onshore · Operational | 6 | 9.1 km |
Wind Onshore · Operational | 15.8 | 10.2 km |
How big is Beinn an Tuirc Windfarm Phase 3?
Beinn an Tuirc Windfarm Phase 3 has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Beinn an Tuirc Windfarm Phase 3?
REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Beinn an Tuirc Windfarm Phase 3 approved and built?
The application was submitted on 3 November 2015. Permission was granted on 23 February 2017, 16 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3387.