Beinn an Tuirc Windfarm Phase 3

Beinn an Tuirc Windfarm Phase 3 is under construction in Argyll and Bute with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
Scottish Power Renewables
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted2015-11-03
Permission granted2017-02-23
16 months after submission
Operationalnot recorded

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Auchadaduie Wind Farm
Wind Onshore · Operational
6.93.1 km
Blary Hill Wind Farm
Wind Onshore · Operational
353.2 km
Beinn an Tuirc
Wind Onshore · Operational
29.73.4 km
Beinn an Tuirc Phase 2
Wind Onshore · Operational
43.73.4 km
Cnoc Donn Arnicle
Wind Onshore · Operational
154.7 km
Tangy Wind Farm/Tangy 1
Wind Onshore · Operational
12.86.6 km
Tangy Wind Farm Extension/Tangy 2
Wind Onshore · Operational
69.1 km
Deucheran Hill
Wind Onshore · Operational
15.810.2 km

How big is Beinn an Tuirc Windfarm Phase 3?

Beinn an Tuirc Windfarm Phase 3 has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn an Tuirc Windfarm Phase 3?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn an Tuirc Windfarm Phase 3 approved and built?

The application was submitted on 2015-11-03. Permission was granted on 2017-02-23, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3387.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council