Beinn an Tuirc Windfarm Phase 3

Beinn an Tuirc Windfarm Phase 3 is a 49.9 MW onshore wind farm under construction in Argyll and Bute. Planning permission was granted on 23 February 2017, 16 months after submission. Operator of record: Scottish Power Renewables.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
Scottish Power Renewables
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted3 November 2015
Permission granted23 February 2017
16 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Beinn an Tuirc Windfarm Phase 3’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
6.93.1 km
Wind Onshore · Operational
353.2 km
Wind Onshore · Operational
43.73.4 km
Wind Onshore · Operational
29.73.4 km
Wind Onshore · Operational
154.7 km
Wind Onshore · Operational
12.86.6 km
Wind Onshore · Operational
69.1 km
Wind Onshore · Operational
15.810.2 km

How big is Beinn an Tuirc Windfarm Phase 3?

Beinn an Tuirc Windfarm Phase 3 has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn an Tuirc Windfarm Phase 3?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn an Tuirc Windfarm Phase 3 approved and built?

The application was submitted on 3 November 2015. Permission was granted on 23 February 2017, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3387.