Beinn an Tuirc is an operational 29.7 MW onshore wind farm in Argyll and Bute, generating since 23 December 2001. Planning permission was granted on 28 April 1999, 12 months after submission. Operator of record: CRE Energy/ Scottish Power.

29.7 MW
Capacity
as recorded in REPD
Operational
Status
since 23 December 2001
Wind Onshore
Technology
CRE Energy/ Scottish Power
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted20 April 1998
Permission granted28 April 1999
12 months after submission
Operational23 December 2001
32 months after consent

Screening a site of your own?

RedlineUK · £39

Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Beinn an Tuirc’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
43.70 km
Wind Onshore · Operational
151.4 km
Wind Onshore · Under Construction
49.93.4 km
Wind Onshore · Operational
353.6 km
Wind Onshore · Operational
6.95.6 km
Wind Onshore · Operational
15.86.8 km
Wind Onshore · Operational
12.810 km
Wind Onshore · Operational
611.1 km

How big is Beinn an Tuirc?

Beinn an Tuirc has a recorded installed capacity of 29.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn an Tuirc?

REPD records the operator as CRE Energy/ Scottish Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn an Tuirc approved and built?

The application was submitted on 20 April 1998. Permission was granted on 28 April 1999, 12 months later. The site became operational on 23 December 2001, 32 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3292.