Renewable sites › Atherstone
Atherstone
Atherstone is operational in North Warwickshire with a recorded capacity of 14.7 MW, and has been generating since 2015-03-31.
Planning and build timeline
| Application submitted | 2014-09-12 |
| Permission granted | 2014-11-14 2 months after submission |
| Operational | 2015-03-31 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Warwickshire’s record on solar
North Warwickshire has decided 23 solar farms and approved 96%, taking a median of 1.9 months. See every solar farm decision in North Warwickshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Austrey House Farm Anaerobic Digestion · Operational | 1.5 | 3.4 km |
Ld NW Of Ratcliffe House Farm Solar Photovoltaics · Operational | 3.5 | 4 km |
Merevale & Blyth Estate (Biomass Plant) Biomass (dedicated) · Operational | 2.5 | 5 km |
Merevale & Blyth Estate (Waste AD) Anaerobic Digestion · Operational | 2 | 5 km |
Wilnecote Landfill Site Landfill Gas · Operational | 1 | 8.6 km |
Judkins Landfill Scheme Landfill Gas · Operational | 2.7 | 10.4 km |
Judkins Landfill Site Phase 3 Landfill Gas · Operational | 1.2 | 10.5 km |
The Stables Solar Photovoltaics · Operational | 1.8 | 11.1 km |
How big is Atherstone?
Atherstone has a recorded installed capacity of 14.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Atherstone?
REPD records the operator as Foresight Solar Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Atherstone approved and built?
The application was submitted on 2014-09-12. Permission was granted on 2014-11-14, 2 months later. The site became operational on 2015-03-31, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2278.