Ld NW Of Ratcliffe House Farm is operational in Hinckley and Bosworth with a recorded capacity of 3.5 MW, and has been generating since 2015-12-21.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-21
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Hinckley and Bosworth
Authority
England

Planning and build timeline

Application submitted2015-05-19
Permission granted2015-08-17
3 months after submission
Operational2015-12-21
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hinckley and Bosworth’s record on solar

Hinckley and Bosworth has decided 25 solar farms and approved 96%, taking a median of 3 months. See every solar farm decision in Hinckley and Bosworth

Other built sites within 15 km

SiteMWDistance
Atherstone
Solar Photovoltaics · Operational
14.74 km
Merevale & Blyth Estate (Biomass Plant)
Biomass (dedicated) · Operational
2.55.9 km
Merevale & Blyth Estate (Waste AD)
Anaerobic Digestion · Operational
25.9 km
Austrey House Farm
Anaerobic Digestion · Operational
1.56.4 km
Basin Bridge Farm
Solar Photovoltaics · Operational
57.1 km
The Stables
Solar Photovoltaics · Operational
1.87.1 km
Judkins Landfill Scheme
Landfill Gas · Operational
2.77.2 km
Judkins Landfill Site Phase 3
Landfill Gas · Operational
1.27.2 km

How big is Ld NW Of Ratcliffe House Farm?

Ld NW Of Ratcliffe House Farm has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ld NW Of Ratcliffe House Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ld NW Of Ratcliffe House Farm approved and built?

The application was submitted on 2015-05-19. Permission was granted on 2015-08-17, 3 months later. The site became operational on 2015-12-21, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5305.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council