Renewable sitesJudkins Landfill Site Phase 3

Judkins Landfill Site Phase 3

Judkins Landfill Site Phase 3 is operational in Nuneaton and Bedworth with a recorded capacity of 1.2 MW, and has been generating since 1996-05-01.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-05-01
Landfill Gas
Technology
Greenways
Nuneaton and Bedworth
Authority
England

Planning and build timeline

Application submitted1995-06-09
Permission granted1995-12-14
6 months after submission
Operational1996-05-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Judkins Landfill Scheme
Landfill Gas · Operational
2.70.1 km
Basin Bridge Farm
Solar Photovoltaics · Operational
55.4 km
The Stables
Solar Photovoltaics · Operational
1.87.1 km
Ld NW Of Ratcliffe House Farm
Solar Photovoltaics · Operational
3.57.2 km
Merevale & Blyth Estate (Waste AD)
Anaerobic Digestion · Operational
28.4 km
Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic Panels
Solar Photovoltaics · Under Construction
258.4 km
Merevale & Blyth Estate (Biomass Plant)
Biomass (dedicated) · Operational
2.58.4 km
Coventry National Grid Substation
Battery · Operational
49.98.7 km

How big is Judkins Landfill Site Phase 3?

Judkins Landfill Site Phase 3 has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Judkins Landfill Site Phase 3?

REPD records the operator as Greenways. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Judkins Landfill Site Phase 3 approved and built?

The application was submitted on 1995-06-09. Permission was granted on 1995-12-14, 6 months later. The site became operational on 1996-05-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 542.