Novarly ParcelRenewable sites

Renewable sitesAustrey House Farm

Austrey House Farm

Austrey House Farm is operational in North Warwickshire with a recorded capacity of 1.5 MW, and has been generating since 2016-06-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-01
Anaerobic Digestion
Technology
William Corbett Farms
North Warwickshire
Authority
England

Planning and build timeline

Application submitted2015-05-01
Permission granted2015-09-17
5 months after submission
Operational2016-06-01
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Atherstone
Solar Photovoltaics · Operational
14.73.4 km
Ld NW Of Ratcliffe House Farm
Solar Photovoltaics · Operational
3.56.4 km
Merevale & Blyth Estate (Biomass Plant)
Biomass (dedicated) · Operational
2.58.3 km
Merevale & Blyth Estate (Waste AD)
Anaerobic Digestion · Operational
28.3 km
Packington Solar Farm
Solar Photovoltaics · Operational
13.99.1 km
Shortheath Solar Park
Solar Photovoltaics · Operational
59.7 km
Wilnecote Landfill Site
Landfill Gas · Operational
19.7 km
Ashby Solar Farm (a)
Solar Photovoltaics · Operational
510.1 km

How big is Austrey House Farm?

Austrey House Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Austrey House Farm?

REPD records the operator as William Corbett Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Austrey House Farm approved and built?

The application was submitted on 2015-05-01. Permission was granted on 2015-09-17, 5 months later. The site became operational on 2016-06-01, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5668.