Clayhill Farm

Clayhill Farm is operational in Central Bedfordshire with a recorded capacity of 10 MW, and has been generating since 2016-06-24.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-24
Solar Photovoltaics
Technology
Anesco
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted2014-09-01
Permission granted2015-01-29
5 months after submission
Operational2016-06-24
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Central Bedfordshire’s record on solar

Central Bedfordshire has decided 32 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Central Bedfordshire

Other built sites within 15 km

SiteMWDistance
Clayhill
Battery · Operational
60 km
Clayhill Farm - Battery Energy Storage
Battery · Operational
210.6 km
Sundon Landfill Site
Landfill Gas · Operational
2.64.9 km
Sundon Substation
Battery · Operational
49.96.4 km
Chapel Farm
Battery · Operational
49.57 km
Goosey Lodge Industrial Estate
Biomass (dedicated) · Operational
168.9 km
Marston Vale Country Park Wind Turbine
Wind Onshore · Operational
1.59.3 km
Trinity Hall Farm
Anaerobic Digestion · Operational
1.19.6 km

How big is Clayhill Farm?

Clayhill Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Clayhill Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Clayhill Farm approved and built?

The application was submitted on 2014-09-01. Permission was granted on 2015-01-29, 5 months later. The site became operational on 2016-06-24, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2265.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council