Altahullion Phase II is operational in Causeway Coast and Glens with a recorded capacity of 11.7 MW, and has been generating since 2007-09-01.

11.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-09-01
Wind Onshore
Technology
B9 Energy / RES
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted2004-11-22
Permission granted2006-04-06
16 months after submission
Operational2007-09-01
17 months after consent

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Slieve Kirk (formerly Glenconway)
Wind Onshore · Operational
18.42 km
Slieve Kirk (formerly Altahullion Phase III & Glenconway 2)
Wind Onshore · Operational
27.62.3 km
Altahullion
Wind Onshore · Operational
262.4 km
Monnaboy Wind Farm
Wind Onshore · Operational
128.7 km
Brockaghboy Wind Farm - extension
Wind Onshore · Operational
1011.5 km
Rigged Hill Wind Farm
Wind Onshore · Operational
512.9 km
Craiggore windfarm
Wind Onshore · Operational
23.513 km
Dunmore
Wind Onshore · Operational
2113.1 km

How big is Altahullion Phase II?

Altahullion Phase II has a recorded installed capacity of 11.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Altahullion Phase II?

REPD records the operator as B9 Energy / RES. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Altahullion Phase II approved and built?

The application was submitted on 2004-11-22. Permission was granted on 2006-04-06, 16 months later. The site became operational on 2007-09-01, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3244.