Craiggore windfarm is operational in Causeway Coast and Glens with a recorded capacity of 23.5 MW.

23.5 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Wind Onshore
Technology
Renewable Energy Systems (RES)
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted2012-10-15
Permission granted2015-03-05
29 months after submission
Operationalnot recorded

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Brockaghboy Wind Farm
Wind Onshore · Operational
37.52.8 km
Rigged Hill Wind Farm
Wind Onshore · Operational
53.2 km
Dunmore
Wind Onshore · Operational
219.9 km
Windyhill Road (Dunbeg) Wind Farm
Wind Onshore · Operational
4211 km
Brockaghboy Wind Farm - extension
Wind Onshore · Operational
1011.6 km
Altahullion Phase II
Wind Onshore · Operational
11.713 km
Slieve Kirk (formerly Glenconway)
Wind Onshore · Operational
18.414.8 km

How big is Craiggore windfarm?

Craiggore windfarm has a recorded installed capacity of 23.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Craiggore windfarm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Craiggore windfarm approved and built?

The application was submitted on 2012-10-15. Permission was granted on 2015-03-05, 29 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4297.