Craiggore windfarm is an operational 23.5 MW onshore wind farm in Causeway Coast and Glens. Planning permission was granted on 5 March 2015, 29 months after submission. Operator of record: Renewable Energy Systems (RES).

23.5 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Wind Onshore
Technology
Renewable Energy Systems (RES)
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted15 October 2012
Permission granted5 March 2015
29 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Causeway Coast and Glens approves 97% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Craiggore windfarm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
37.52.8 km
Wind Onshore · Operational
53.2 km
Wind Onshore · Operational
219.9 km
Wind Onshore · Operational
4211 km
Wind Onshore · Operational
1011.6 km
Wind Onshore · Operational
11.713 km
Wind Onshore · Operational
18.414.8 km

How big is Craiggore windfarm?

Craiggore windfarm has a recorded installed capacity of 23.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Craiggore windfarm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Craiggore windfarm approved and built?

The application was submitted on 15 October 2012. Permission was granted on 5 March 2015, 29 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4297.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode