Renewable sitesBrockaghboy Wind Farm - extension

Brockaghboy Wind Farm - extension

Brockaghboy Wind Farm - extension is an operational 10 MW onshore wind farm in Causeway Coast and Glens, generating since 1 September 2017. Planning permission was granted on 27 October 2015, 16 months after submission. Operator of record: Greencoat.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2017
Wind Onshore
Technology
Greencoat
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted25 June 2014
Permission granted27 October 2015
16 months after submission
Operational1 September 2017
22 months after consent

Screening a site of your own?

RedlineUK · £39

Causeway Coast and Glens approves 97% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brockaghboy Wind Farm - extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
37.511.3 km
Wind Onshore · Operational
11.711.5 km
Wind Onshore · Operational
23.511.6 km
Wind Onshore · Operational
2612.7 km
Wind Onshore · Operational
27.613.3 km
Wind Onshore · Operational
18.413.4 km
Wind Onshore · Operational
514 km
Wind Onshore · Operational
614.2 km

How big is Brockaghboy Wind Farm - extension?

Brockaghboy Wind Farm - extension has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brockaghboy Wind Farm - extension?

REPD records the operator as Greencoat. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brockaghboy Wind Farm - extension approved and built?

The application was submitted on 25 June 2014. Permission was granted on 27 October 2015, 16 months later. The site became operational on 1 September 2017, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2888.