Novarly ParcelRenewable sites

Renewable sitesWix Lodge

Wix Lodge

Wix Lodge is an operational 18.7 MW solar farm in Tendring, generating since 31 March 2014. Planning permission was granted on 15 November 2013, 3 months after submission. Operator of record: Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar.

18.7 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Solar Photovoltaics
Technology
Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar
Tendring
Authority
England

Planning and build timeline

Application submitted19 August 2013
Permission granted15 November 2013
3 months after submission
Operational31 March 2014
4 months after consent

Screening a site of your own?

RedlineUK · £39

Tendring approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wix Lodge’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tendring’s record on solar

Tendring has decided 18 solar farms and approved 83%, taking a median of 3 months. See every solar farm decision in Tendring

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52 km
Solar Photovoltaics · Operational
4.23.1 km
Solar Photovoltaics · Operational
11.99 km
Wind Onshore · Operational
1.59.9 km
Solar Photovoltaics · Operational
10.510 km
Solar Photovoltaics · Operational
1310.4 km
Wind Onshore · Operational
10.311.6 km
Sewage Sludge Digestion · Operational
1.213.8 km

How big is Wix Lodge?

Wix Lodge has a recorded installed capacity of 18.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wix Lodge?

REPD records the operator as Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wix Lodge approved and built?

The application was submitted on 19 August 2013. Permission was granted on 15 November 2013, 3 months later. The site became operational on 31 March 2014, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1332.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode