Wix Lodge

Wix Lodge is operational in Tendring with a recorded capacity of 18.7 MW, and has been generating since 2014-03-31.

18.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar
Tendring
Authority
England

Planning and build timeline

Application submitted2013-08-19
Permission granted2013-11-15
3 months after submission
Operational2014-03-31
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tendring’s record on solar

Tendring has decided 18 solar farms and approved 83%, taking a median of 3 months. See every solar farm decision in Tendring

Other built sites within 15 km

SiteMWDistance
Green Farm
Solar Photovoltaics · Operational
52 km
Barn Farm
Solar Photovoltaics · Operational
4.23.1 km
Chancery Farm (Ardleigh)
Solar Photovoltaics · Operational
11.99 km
Blue Gates Farm
Wind Onshore · Operational
1.59.9 km
Bluegates Solar Park
Solar Photovoltaics · Operational
10.510 km
Chisbon Solar Farm (Frowick Lane)
Solar Photovoltaics · Operational
1310.4 km
Earl's Hall
Wind Onshore · Operational
10.311.6 km
Colchester STW
Sewage Sludge Digestion · Operational
1.213.8 km

How big is Wix Lodge?

Wix Lodge has a recorded installed capacity of 18.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wix Lodge?

REPD records the operator as Sunsave 25 (Wix Lodge Farm) Limited/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wix Lodge approved and built?

The application was submitted on 2013-08-19. Permission was granted on 2013-11-15, 3 months later. The site became operational on 2014-03-31, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1332.