Renewable sites › Colchester STW
Colchester STW
Colchester STW is an operational 1.2 MW sewage sludge digestion plant in Colchester, generating since 11 September 2013. Planning permission was granted on 9 October 2012, 4 months after submission. Operator of record: Anglian Water Services Ltd.
Planning and build timeline
| Application submitted | 1 June 2012 |
| Permission granted | 9 October 2012 4 months after submission |
| Operational | 11 September 2013 11 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Colchester: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Colchester STW’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1.5 | 5.1 km |
Solar Photovoltaics · Operational | 10.5 | 5.2 km |
Solar Photovoltaics · Operational | 11.9 | 5.7 km |
Solar Photovoltaics · Operational | 49 | 6.8 km |
Solar Photovoltaics · Operational | 21.3 | 6.9 km |
Landfill Gas · Operational | 3.9 | 7.3 km |
Solar Photovoltaics · Operational | 18.8 | 7.5 km |
Landfill Gas · Operational | 2.7 | 7.8 km |
How big is Colchester STW?
Colchester STW has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Colchester STW?
REPD records the operator as Anglian Water Services Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Colchester STW approved and built?
The application was submitted on 1 June 2012. Permission was granted on 9 October 2012, 4 months later. The site became operational on 11 September 2013, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2390.