Novarly ParcelRenewable sites

Renewable sitesBury Lane Fruit Farm

Bury Lane Fruit Farm

Bury Lane Fruit Farm is operational in South Cambridgeshire with a recorded capacity of 24 MW, and has been generating since 2014-12-19.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-19
Solar Photovoltaics
Technology
Vortex (formerly Sun Edison)
South Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2013-12-18
Permission granted2014-05-12
5 months after submission
Operational2014-12-19
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Cambridgeshire’s record on solar

South Cambridgeshire has decided 41 solar farms and approved 88%, taking a median of 3.9 months. See every solar farm decision in South Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Munceys Farm
Solar Photovoltaics · Operational
31.61.7 km
Royston Solar Farm (Phase 1) (a)
Solar Photovoltaics · Operational
52.3 km
Black Peak Farm
Solar Photovoltaics · Operational
31.83.2 km
Bassingbourn Solar Farm
Solar Photovoltaics · Operational
14.43.2 km
Hoback Farm
Solar Photovoltaics · Operational
13.14.9 km
Vine Farm Solar Park
Solar Photovoltaics · Operational
456 km
Hatch Penn Farm PV
Solar Photovoltaics · Operational
16.6 km
Lamp Hill Wimpole Estate
Solar Photovoltaics · Operational
0.46.8 km

How big is Bury Lane Fruit Farm?

Bury Lane Fruit Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bury Lane Fruit Farm?

REPD records the operator as Vortex (formerly Sun Edison). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bury Lane Fruit Farm approved and built?

The application was submitted on 2013-12-18. Permission was granted on 2014-05-12, 5 months later. The site became operational on 2014-12-19, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2372.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council