Novarly ParcelRenewable sites

Renewable sitesWind Farm Africa Alive

Wind Farm Africa Alive

Wind Farm Africa Alive is operational in East Suffolk with a recorded capacity of 4.1 MW, and has been generating since 2011-06-01.

4.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-06-01
Wind Onshore
Technology
SLP Energy
East Suffolk
Authority
England

Planning and build timeline

Application submitted2006-12-18
Permission granted2008-05-01
16 months after submission
Operational2011-06-01
37 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on onshore wind

East Suffolk has decided 6 onshore wind schemes and approved 67%, taking a median of 5.4 months. See every onshore wind scheme decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Priory Farm
Solar Photovoltaics · Operational
3.14.2 km
Ellough Airfield (Resubmission)
Solar Photovoltaics · Operational
13.27 km
Ellough Airfield (Ellough 2 extension)
Solar Photovoltaics · Operational
107.1 km
Promens Solar
Solar Photovoltaics · Operational
1.77.7 km
Ness point Wind Turbine 1
Wind Onshore · Operational
2.38.3 km
Playters Solar Farm
Solar Photovoltaics · Operational
8.68.3 km
Reydon Farm
Solar Photovoltaics · Operational
3.99.1 km
Upper Holton Wind Farm
Wind Onshore · Operational
11.512.9 km

How big is Wind Farm Africa Alive?

Wind Farm Africa Alive has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wind Farm Africa Alive?

REPD records the operator as SLP Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wind Farm Africa Alive approved and built?

The application was submitted on 2006-12-18. Permission was granted on 2008-05-01, 16 months later. The site became operational on 2011-06-01, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2988.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council