Ness point Wind Turbine 1

Ness point Wind Turbine 1 is operational in East Suffolk with a recorded capacity of 2.3 MW, and has been generating since 2004-12-01.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-12-01
Wind Onshore
Technology
SLP Energy
East Suffolk
Authority
England

Planning and build timeline

Application submitted2001-10-31
Permission granted2002-09-27
11 months after submission
Operational2004-12-01
26 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on onshore wind

East Suffolk has decided 6 onshore wind schemes and approved 67%, taking a median of 5.4 months. See every onshore wind scheme decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Priory Farm
Solar Photovoltaics · Operational
3.16.9 km
Wind Farm Africa Alive
Wind Onshore · Operational
4.18.3 km
James Paget University Hospital - Design And Installation Of PV Panels
Solar Photovoltaics · Under Construction
9.5 km
Ellough Airfield (Ellough 2 extension)
Solar Photovoltaics · Operational
1011.5 km
Ellough Airfield (Resubmission)
Solar Photovoltaics · Operational
13.211.8 km
Promens Solar
Solar Photovoltaics · Operational
1.712.2 km
Playters Solar Farm
Solar Photovoltaics · Operational
8.612.7 km

How big is Ness point Wind Turbine 1?

Ness point Wind Turbine 1 has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ness point Wind Turbine 1?

REPD records the operator as SLP Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ness point Wind Turbine 1 approved and built?

The application was submitted on 2001-10-31. Permission was granted on 2002-09-27, 11 months later. The site became operational on 2004-12-01, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3105.