Renewable sitesNess point Wind Turbine 1

Ness point Wind Turbine 1

Ness point Wind Turbine 1 is an operational 2.3 MW onshore wind farm in East Suffolk, generating since 1 December 2004. Planning permission was granted on 27 September 2002, 11 months after submission. Operator of record: SLP Energy.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2004
Wind Onshore
Technology
SLP Energy
East Suffolk
Authority
England

Planning and build timeline

Application submitted31 October 2001
Permission granted27 September 2002
11 months after submission
Operational1 December 2004
26 months after consent

Screening a site of your own?

RedlineUK · £39

East Suffolk approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ness point Wind Turbine 1’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on onshore wind

East Suffolk has decided 6 onshore wind schemes and approved 67%, taking a median of 5.4 months. See every onshore wind scheme decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
3.16.9 km
Wind Onshore · Operational
4.18.3 km
Solar Photovoltaics · Under Construction
9.5 km
Solar Photovoltaics · Operational
1011.5 km
Solar Photovoltaics · Operational
13.211.8 km
Solar Photovoltaics · Operational
1.712.2 km
Solar Photovoltaics · Operational
8.612.7 km

How big is Ness point Wind Turbine 1?

Ness point Wind Turbine 1 has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ness point Wind Turbine 1?

REPD records the operator as SLP Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ness point Wind Turbine 1 approved and built?

The application was submitted on 31 October 2001. Permission was granted on 27 September 2002, 11 months later. The site became operational on 1 December 2004, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3105.