Promens Solar is operational in East Suffolk with a recorded capacity of 1.7 MW, and has been generating since 2011-07-21.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-21
Solar Photovoltaics
Technology
Lightsource Renewable Energy
East Suffolk
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2011-07-21

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on solar

East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Playters Solar Farm
Solar Photovoltaics · Operational
8.60.6 km
Ellough Airfield (Ellough 2 extension)
Solar Photovoltaics · Operational
100.7 km
Ellough Airfield (Resubmission)
Solar Photovoltaics · Operational
13.20.8 km
Priory Farm
Solar Photovoltaics · Operational
3.15.5 km
Wind Farm Africa Alive
Wind Onshore · Operational
4.17.7 km
Upper Holton Wind Farm
Wind Onshore · Operational
11.59 km
Holton Airfield
Solar Photovoltaics · Operational
119.8 km
Norwich Road Industrial Estate
Battery · Under Construction
5010.8 km

How big is Promens Solar?

Promens Solar has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Promens Solar?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Promens Solar approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2011-07-21.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1078.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council