Priory Farm

Priory Farm is operational in East Suffolk with a recorded capacity of 3.1 MW, and has been generating since 2014-03-29.

3.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-29
Solar Photovoltaics
Technology
Private Developer
East Suffolk
Authority
England

Planning and build timeline

Application submitted2012-11-27
Permission granted2013-02-25
3 months after submission
Operational2014-03-29
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on solar

East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Wind Farm Africa Alive
Wind Onshore · Operational
4.14.2 km
Ellough Airfield (Ellough 2 extension)
Solar Photovoltaics · Operational
104.8 km
Ellough Airfield (Resubmission)
Solar Photovoltaics · Operational
13.25 km
Promens Solar
Solar Photovoltaics · Operational
1.75.5 km
Playters Solar Farm
Solar Photovoltaics · Operational
8.66 km
Ness point Wind Turbine 1
Wind Onshore · Operational
2.36.9 km
Reydon Farm
Solar Photovoltaics · Operational
3.912.2 km
James Paget University Hospital - Design And Installation Of PV Panels
Solar Photovoltaics · Under Construction
12.9 km

How big is Priory Farm?

Priory Farm has a recorded installed capacity of 3.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Priory Farm?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Priory Farm approved and built?

The application was submitted on 2012-11-27. Permission was granted on 2013-02-25, 3 months later. The site became operational on 2014-03-29, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2284.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council