Reydon Farm is an operational 3.9 MW solar farm in East Suffolk, generating since 15 March 2015. Planning permission was granted on 6 June 2013, 3 months after submission. Operator of record: Green Hedge (BayWa r.e.).

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2015
Solar Photovoltaics
Technology
Green Hedge (BayWa r.e.)
East Suffolk
Authority
England

Planning and build timeline

Application submitted11 March 2013
Permission granted6 June 2013
3 months after submission
Operational15 March 2015
21 months after consent

Screening a site of your own?

RedlineUK · £39

East Suffolk approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Reydon Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on solar

East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
11.58.4 km
Solar Photovoltaics · Operational
118.5 km
Wind Onshore · Operational
4.19.1 km
Battery · Under Construction
509.6 km
Solar Photovoltaics · Operational
13.210.8 km
Solar Photovoltaics · Operational
1011.3 km
Solar Photovoltaics · Operational
1.711.4 km
Solar Photovoltaics · Operational
8.611.7 km

How big is Reydon Farm?

Reydon Farm has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Reydon Farm?

REPD records the operator as Green Hedge (BayWa r.e.). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Reydon Farm approved and built?

The application was submitted on 11 March 2013. Permission was granted on 6 June 2013, 3 months later. The site became operational on 15 March 2015, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1751.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode