Whitemoor is an operational 18 MW biomass plant in North Yorkshire, generating since 1 October 2014. Planning permission was granted on 29 November 2012, 2 months after submission. Operator of record: REG Bio-Power.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2014
Biomass (dedicated)
Technology
REG Bio-Power
North Yorkshire
Authority
England

Planning and build timeline

Application submitted27 September 2012
Permission granted29 November 2012
2 months after submission
Operational1 October 2014
22 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Whitemoor’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.37.4 km
Biomass (dedicated) · Operational
6458.8 km
Biomass (co-firing) · Operational
6458.8 km
Biomass (dedicated) · Operational
6458.8 km
Biomass (dedicated) · Operational
6458.8 km
Wind Onshore · Operational
249.8 km
Battery · Operational
4010 km
Wind Onshore · Operational
12.512.9 km

How big is Whitemoor?

Whitemoor has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whitemoor?

REPD records the operator as REG Bio-Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whitemoor approved and built?

The application was submitted on 27 September 2012. Permission was granted on 29 November 2012, 2 months later. The site became operational on 1 October 2014, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5003.