Drax Biomass Power Station - Unit 4

Drax Biomass Power Station - Unit 4 is operational in England with a recorded capacity of 645 MW, and has been generating since 2018-08-21.

645 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-08-21
Biomass (dedicated)
Technology
Drax Power
National
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2018-08-21

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Drax Biomass Power Station - Unit 2
Biomass (dedicated) · Operational
6450 km
Drax Biomass Power Station - Unit 1
Biomass (co-firing) · Operational
6450 km
Drax Biomass Power Station - Unit 3
Biomass (dedicated) · Operational
6450 km
Rusholme Wind Farm
Wind Onshore · Operational
242.9 km
Rusholme Grange
Battery · Operational
403.6 km
Loftsome Bridge
Wind Onshore · Operational
1.34.2 km
Croda Chemicals Europe
Wind Onshore · Operational
36 km
Land at Pollington Airfield
Solar Photovoltaics · Operational
58.5 km

How big is Drax Biomass Power Station - Unit 4?

Drax Biomass Power Station - Unit 4 has a recorded installed capacity of 645 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Drax Biomass Power Station - Unit 4?

REPD records the operator as Drax Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Drax Biomass Power Station - Unit 4 approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2018-08-21.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6659.