Novarly ParcelRenewable sites

Renewable sitesDrax Biomass Power Station - Unit 2

Drax Biomass Power Station - Unit 2

Drax Biomass Power Station - Unit 2 is an operational 645 MW biomass plant in North Yorkshire, generating since 30 May 2014. REPD does not record the planning grant date. Operator of record: Drax Power.

645 MW
Capacity
as recorded in REPD
Operational
Status
since 30 May 2014
Biomass (dedicated)
Technology
Drax Power
North Yorkshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational30 May 2014

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Drax Biomass Power Station - Unit 2’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
6450 km
Biomass (dedicated) · Operational
6450 km
Biomass (co-firing) · Operational
6450 km
Wind Onshore · Operational
242.9 km
Battery · Operational
403.6 km
Wind Onshore · Operational
1.34.2 km
Wind Onshore · Operational
36 km
Solar Photovoltaics · Operational
58.5 km

How big is Drax Biomass Power Station - Unit 2?

Drax Biomass Power Station - Unit 2 has a recorded installed capacity of 645 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Drax Biomass Power Station - Unit 2?

REPD records the operator as Drax Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Drax Biomass Power Station - Unit 2 approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 30 May 2014.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 192.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode