West Durham Wind Farm

West Durham Wind Farm is an operational 24 MW onshore wind farm in County Durham, generating since 1 May 2009. Planning permission was granted on 1 December 2005, 11 months after submission. Operator of record: ESBI.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2009
Wind Onshore
Technology
ESBI
County Durham
Authority
England

Planning and build timeline

Application submitted1 January 2005
Permission granted1 December 2005
11 months after submission
Operational1 May 2009
41 months after consent

Screening a site of your own?

RedlineUK · £39

County Durham approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with West Durham Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.60.5 km
Wind Onshore · Operational
5.23.7 km
Wind Onshore · Operational
2.43.7 km
Wind Onshore · Operational
83.8 km
Solar Photovoltaics · Under Construction
58.6 km
Anaerobic Digestion · Operational
110.1 km
Solar Photovoltaics · Operational
0.3810.5 km
Wind Onshore · Operational
410.5 km

How big is West Durham Wind Farm?

West Durham Wind Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West Durham Wind Farm?

REPD records the operator as ESBI. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West Durham Wind Farm approved and built?

The application was submitted on 1 January 2005. Permission was granted on 1 December 2005, 11 months later. The site became operational on 1 May 2009, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2955.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode