Novarly ParcelRenewable sites

Renewable sitesWeek Farm Solar Park

Week Farm Solar Park

Week Farm Solar Park is an operational 3.3 MW solar farm in Torridge, generating since 28 March 2014. Planning permission was granted on 30 July 2013, 3 months after submission. Operator of record: Unknown.

3.3 MW
Capacity
as recorded in REPD
Operational
Status
since 28 March 2014
Solar Photovoltaics
Technology
Unknown
Torridge
Authority
England

Planning and build timeline

Application submitted15 April 2013
Permission granted30 July 2013
3 months after submission
Operational28 March 2014
8 months after consent

Screening a site of your own?

RedlineUK · £39

Torridge approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Week Farm Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Torridge’s record on solar

Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.62.2 km
Solar Photovoltaics · Operational
22.5 km
Landfill Gas · Operational
22.7 km
Solar Photovoltaics · Operational
3.53.7 km
Solar Photovoltaics · Operational
4.76 km
Solar Photovoltaics · Under Construction
326.3 km
Solar Photovoltaics · Operational
5.26.6 km
Solar Photovoltaics · Operational
0.158.4 km

How big is Week Farm Solar Park?

Week Farm Solar Park has a recorded installed capacity of 3.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Week Farm Solar Park?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Week Farm Solar Park approved and built?

The application was submitted on 15 April 2013. Permission was granted on 30 July 2013, 3 months later. The site became operational on 28 March 2014, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1659.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode