Deep Moor Landfill Site

Deep Moor Landfill Site is an operational 2 MW solar farm in Torridge, generating since 20 April 2018. Planning permission was granted on 2 February 2017, 11 months after submission. Operator of record: Coastal Recycling UK (formerly Devon Waste Management).

2 MW
Capacity
as recorded in REPD
Operational
Status
since 20 April 2018
Solar Photovoltaics
Technology
Coastal Recycling UK (formerly Devon Waste Management)
Torridge
Authority
England

Planning and build timeline

Application submitted9 March 2016
Permission granted2 February 2017
11 months after submission
Operational20 April 2018
15 months after consent

Screening a site of your own?

RedlineUK · £39

Torridge approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Deep Moor Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Torridge’s record on solar

Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20.5 km
Wind Onshore · Operational
2.61.7 km
Solar Photovoltaics · Operational
3.32.5 km
Solar Photovoltaics · Operational
3.52.7 km
Solar Photovoltaics · Operational
4.75.1 km
Solar Photovoltaics · Under Construction
325.3 km
Solar Photovoltaics · Operational
5.26.5 km
Solar Photovoltaics · Operational
0.158.4 km

How big is Deep Moor Landfill Site?

Deep Moor Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Deep Moor Landfill Site?

REPD records the operator as Coastal Recycling UK (formerly Devon Waste Management). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Deep Moor Landfill Site approved and built?

The application was submitted on 9 March 2016. Permission was granted on 2 February 2017, 11 months later. The site became operational on 20 April 2018, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6328.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode