Pulteney Distillery

Pulteney Distillery is operational in Highland with a recorded capacity of 3.5 MW, and has been generating since 2012-01-01.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-01-01
Biomass (dedicated)
Technology
GIB and Equitix
Highland
Authority
Scotland

Planning and build timeline

Application submitted2011-01-21
Permission granted2011-02-25
1 months after submission
Operational2012-01-01
10 months after consent

Other built sites within 15 km

SiteMWDistance
Causeymire
Wind Onshore · Operational
48.31 km
Achairn
Wind Onshore · Operational
6.26.8 km
Wathegar 2 Wind Farm
Wind Onshore · Operational
18.57.6 km
Camster II
Wind Onshore · Under Construction
368.1 km
Wathegar wind farm
Wind Onshore · Operational
108.2 km
Bilbster Wind Farm
Wind Onshore · Operational
3.99.7 km
Burn of Whilk
Wind Onshore · Operational
22.511.1 km
Camster
Wind Onshore · Operational
5011.2 km

How big is Pulteney Distillery?

Pulteney Distillery has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pulteney Distillery?

REPD records the operator as GIB and Equitix. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pulteney Distillery approved and built?

The application was submitted on 2011-01-21. Permission was granted on 2011-02-25, 1 months later. The site became operational on 2012-01-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6091.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council